Data Centre Register Sign in free

Home › Data centres › Zimbabwe

Data centres in Zimbabwe

As of 16 October 2026, the Data Centre Register lists 5 data centres in Zimbabwe with 1 MW of live IT capacity and 0 MW in the pipeline (0 MW under construction, 0 MW committed and 0 MW at an early stage).

5data centres
1 MWlive IT capacity
0 MWin the pipeline
0 MWunder construction

Capacity by stage

StageSitesIT capacity
Live51 MW
Under construction00 MW
Committed00 MW
Early stage00 MW
Land banked0–
No capacity listed0–

A site counts in the most advanced stage that has capacity listed. Pipeline is under construction, committed and early stage together.

Largest operators in Zimbabwe

OperatorSitesLive MWPipeline MW
TelOne310
NetOne100
Utande Internet Services100

Cities

CitySitesLive MWPipeline MW
Harare300
Bulawayo100
Mazowe100

Types of data centre

Zimbabwe has 0 colocation and 5 self-build data centres. By category: Self-build Network & Telco (4), Self-build Systems Integrator/Managed Service Providers (1). Ready-for-service years listed run from 2011 to 2022.

See every Zimbabwe site on the map

The register has a record for each of these 5 sites: operator, address, coordinates, capacity by stage, ready-for-service year and sources. Sign in with Google for a free account: 5 full site records and 100 sites in lists a day. Pro (US$49 a month) opens 300 records a day, full query lists and Ask AI.

Frequently asked questions

How many data centres are there in Zimbabwe?
The Data Centre Register lists 5 data centres in Zimbabwe as of 16 October 2026: 5 live, 0 under construction, 0 committed and 0 at an early stage, of which 0 colocation and 5 self-build.
What is the data centre capacity of Zimbabwe?
Zimbabwe has 1 MW of live data centre IT capacity, with a further 0 MW in the pipeline (0 MW under construction, 0 MW committed and 0 MW at an early stage), for 1 MW in total.
Which operators have the most data centre capacity in Zimbabwe?
By total IT capacity listed, the largest operators in Zimbabwe are TelOne, NetOne and Utande Internet Services. TelOne has 3 sites with 1 MW.
Where are the data centres in Zimbabwe?
The cities with the most data centre capacity in Zimbabwe are Harare, Bulawayo and Mazowe.
Where does this data come from?
The Data Centre Register at globaldcwiki.com is built from a register of data centre sites. Every proposed change is checked against outside sources and accepted by an admin before it appears. Figures were last updated on 16 October 2026.

Other data centre markets

Last updated 16 October 2026. Cite as: Data Centre Register, "Data centres in Zimbabwe", https://www.globaldcwiki.com/data-centres/zimbabwe.