Data centres in Rwanda

As of 16 October 2026, the Data Centre Register lists 2 data centres in Rwanda with 0 MW of live IT capacity and 2 MW in the pipeline (0 MW under construction, 2 MW committed and 0 MW at an early stage).

2data centres
0 MWlive IT capacity
2 MWin the pipeline
0 MWunder construction

Capacity by stage

StageSitesIT capacity
Live00 MW
Under construction00 MW
Committed12 MW
Early stage00 MW
Land banked0–
No capacity listed1–

A site counts in the most advanced stage that has capacity listed. Pipeline is under construction, committed and early stage together.

Largest operators in Rwanda

OperatorSitesLive MWPipeline MW
Africa Data Centres102
Telecom House100

Cities

CitySitesLive MWPipeline MW
Gisozi102
Kigali100

Types of data centre

Rwanda has 1 colocation and 1 self-build data centres. By category: Retail (1), Self-build Network & Telco (1). Ready-for-service years listed run from 2024 to 2024.

See every Rwanda site on the map

The register has a record for each of these 2 sites: operator, address, coordinates, capacity by stage, ready-for-service year and sources. Sign in with Google for a free account: 5 full site records and 100 sites in lists a day. Pro (US$49 a month) opens 300 records a day, full query lists and Ask AI.

Frequently asked questions

How many data centres are there in Rwanda?
The Data Centre Register lists 2 data centres in Rwanda as of 16 October 2026: 0 live, 0 under construction, 1 committed and 0 at an early stage, of which 1 colocation and 1 self-build.
What is the data centre capacity of Rwanda?
Rwanda has 0 MW of live data centre IT capacity, with a further 2 MW in the pipeline (0 MW under construction, 2 MW committed and 0 MW at an early stage), for 2 MW in total.
Which operators have the most data centre capacity in Rwanda?
By total IT capacity listed, the largest operators in Rwanda are Africa Data Centres and Telecom House. Africa Data Centres has 1 site with 2 MW.
Where are the data centres in Rwanda?
The cities with the most data centre capacity in Rwanda are Gisozi and Kigali.
Where does this data come from?
The Data Centre Register at globaldcwiki.com is built from a register of data centre sites. Every proposed change is checked against outside sources and accepted by an admin before it appears. Figures were last updated on 16 October 2026.

Other data centre markets

Last updated 16 October 2026. Cite as: Data Centre Register, "Data centres in Rwanda", https://www.globaldcwiki.com/data-centres/rwanda.