Data centres in Honduras
As of 16 October 2026, the Data Centre Register lists 6 data centres in Honduras with 4 MW of live IT capacity and 0 MW in the pipeline (0 MW under construction, 0 MW committed and 0 MW at an early stage).
Capacity by stage
| Stage | Sites | IT capacity |
|---|---|---|
| Live | 6 | 4 MW |
| Under construction | 0 | 0 MW |
| Committed | 0 | 0 MW |
| Early stage | 0 | 0 MW |
| Land banked | 0 | – |
| No capacity listed | 0 | – |
A site counts in the most advanced stage that has capacity listed. Pipeline is under construction, committed and early stage together.
Largest operators in Honduras
| Operator | Sites | Live MW | Pipeline MW |
|---|---|---|---|
| Banco Central de Honduras | 2 | 2 | 0 |
| Tigo | 1 | 1 | 0 |
| BAC Credomatic | 1 | 1 | 0 |
| Grupo Popa | 2 | 0 | 0 |
Cities
| City | Sites | Live MW | Pipeline MW |
|---|---|---|---|
| Tegucigalpa | 4 | 3 | 0 |
| San Pedro Sula | 2 | 1 | 0 |
Types of data centre
Honduras has 3 colocation and 3 self-build data centres. By category: Self-build Financial/Institutional (3), Retail (3). Ready-for-service years listed run from 2009 to 2019.
See every Honduras site on the map
The register has a record for each of these 6 sites: operator, address, coordinates, capacity by stage, ready-for-service year and sources. Sign in with Google for a free account: 5 full site records and 100 sites in lists a day. Pro (US$49 a month) opens 300 records a day, full query lists and Ask AI.
Frequently asked questions
- How many data centres are there in Honduras?
- The Data Centre Register lists 6 data centres in Honduras as of 16 October 2026: 6 live, 0 under construction, 0 committed and 0 at an early stage, of which 3 colocation and 3 self-build.
- What is the data centre capacity of Honduras?
- Honduras has 4 MW of live data centre IT capacity, with a further 0 MW in the pipeline (0 MW under construction, 0 MW committed and 0 MW at an early stage), for 4 MW in total.
- Which operators have the most data centre capacity in Honduras?
- By total IT capacity listed, the largest operators in Honduras are Banco Central de Honduras, Tigo and BAC Credomatic. Banco Central de Honduras has 2 sites with 2 MW.
- Where are the data centres in Honduras?
- The cities with the most data centre capacity in Honduras are Tegucigalpa and San Pedro Sula.
- Where does this data come from?
- The Data Centre Register at globaldcwiki.com is built from a register of data centre sites. Every proposed change is checked against outside sources and accepted by an admin before it appears. Figures were last updated on 16 October 2026.
Other data centre markets
- Data centres in United States
- Data centres in Australia
- Data centres in India
- Data centres in Malaysia
- Data centres in United Kingdom
- Data centres in Canada
- Data centres in Brazil
- Data centres in China
- Data centres in Spain
- Data centres in Finland
- Data centres in South Korea
- Data centres in Japan
- Data centres in Thailand
- Data centres in Indonesia
- Data centres in France
- Data centres in Germany
- Data centres in Italy
- Data centres in Denmark
- Data centres in Saudi Arabia
- Data centres in Ireland
- Data centres in Norway
- Data centres in Sweden
- Data centres in Netherlands
- Data centres in Portugal
Last updated 16 October 2026. Cite as: Data Centre Register, "Data centres in Honduras", https://www.globaldcwiki.com/data-centres/honduras.