Data Centre Register Sign in free

Home › Data centres › Andorra

Data centres in Andorra

As of 16 October 2026, the Data Centre Register lists 2 data centres in Andorra with 1 MW of live IT capacity and 0 MW in the pipeline (0 MW under construction, 0 MW committed and 0 MW at an early stage).

2data centres
1 MWlive IT capacity
0 MWin the pipeline
0 MWunder construction

Capacity by stage

StageSitesIT capacity
Live21 MW
Under construction00 MW
Committed00 MW
Early stage00 MW
Land banked0–
No capacity listed0–

A site counts in the most advanced stage that has capacity listed. Pipeline is under construction, committed and early stage together.

Largest operators in Andorra

OperatorSitesLive MWPipeline MW
Andorra Telecom210

Cities

CitySitesLive MWPipeline MW
La Massana100
Andorra la Vella100

Types of data centre

Andorra has 1 colocation and 1 self-build data centres. By category: Self-build Network & Telco (1), Retail (1). Ready-for-service years listed run from 2012 to 2017.

See every Andorra site on the map

The register has a record for each of these 2 sites: operator, address, coordinates, capacity by stage, ready-for-service year and sources. Sign in with Google for a free account: 5 full site records and 100 sites in lists a day. Pro (US$49 a month) opens 300 records a day, full query lists and Ask AI.

Frequently asked questions

How many data centres are there in Andorra?
The Data Centre Register lists 2 data centres in Andorra as of 16 October 2026: 2 live, 0 under construction, 0 committed and 0 at an early stage, of which 1 colocation and 1 self-build.
What is the data centre capacity of Andorra?
Andorra has 1 MW of live data centre IT capacity, with a further 0 MW in the pipeline (0 MW under construction, 0 MW committed and 0 MW at an early stage), for 1 MW in total.
Which operators have the most data centre capacity in Andorra?
By total IT capacity listed, the largest operators in Andorra are Andorra Telecom. Andorra Telecom has 2 sites with 1 MW.
Where are the data centres in Andorra?
The cities with the most data centre capacity in Andorra are La Massana and Andorra la Vella.
Where does this data come from?
The Data Centre Register at globaldcwiki.com is built from a register of data centre sites. Every proposed change is checked against outside sources and accepted by an admin before it appears. Figures were last updated on 16 October 2026.

Other data centre markets

Last updated 16 October 2026. Cite as: Data Centre Register, "Data centres in Andorra", https://www.globaldcwiki.com/data-centres/andorra.